DataNova for Infrastructure and Concessions

Bill everything you build and know what every project leaves you.

DataNova matches what happens at the work front with the certificates, the supplier statements and the unit price analysis, on the systems you already have. Our engineers put it to work, and your team handles the differences.

Helping contractors and concessionaires bill everything they build, know the margin of every project and answer to the supervising engineer and to lenders.

What changes

What happens on a project today, and what happens with DataNova.

Each row is money lost between the work front and the office.

TodayWith DataNova
Progress certificate

The supervising engineer measures alone, and if the contractor was not there, the supervisor’s quantity counts.

The pre-certificate is signed in the field by both parties, with photo and time.

Quantities

Work not written down at the front never reaches the billing certificate.

Every quantity is recorded the same day from a phone.

Billing

An invoice goes out without the signed pre-certificate, and the client returns the whole invoice.

The invoice goes out with the approved certificate, and every certificate has its payment date.

Standby

The standby clock is kept by the owner of the truck or the machine.

The supplier statement is matched against delivery tickets, hour meters and arrival times.

Daily report

The report is filled in the next day, from memory, and reaches the office days later.

The resident engineer records it at the front, and the office sees it the same day.

Margin

No one compares the bid against what was built, and cost sits in work in progress.

The real cost per installed unit is compared with the bid, project by project.

What it looks like

Every supplier statement, checked against the front.

The supplier’s statement is compared with the delivery tickets, hour meters and arrival times recorded at the front. What matches goes to payment, and what does not goes to whoever resolves it.

Supplier statement · Equipment and hauling
ItemSupplierWork frontStatus
Dump truck, material haulingMatches
Backhoe, hoursHours differ
Dump truck standbyNo arrival timeNeeds support
Motor grader, hoursMatches
Extra hauling tripNo delivery ticketDiffers
Illustrative screen, with no client data.
Site and officeApproveDataNovaERP and scheduleCertificates · bids

On what you already have

DataNova runs on the systems of the company and of every project.

Our engineers connect DataNova to the accounting ERP, the schedule and the forms filled in today on paper or in Excel, with nothing to migrate. The platform does the matching, and your team handles the differences.

  • Accounting ERP
  • Project schedule
  • Daily site report
  • Unit price analysis
  • Supplier statements
  • Delivery tickets and hour meters
  • E-invoicing
  • WhatsApp and email

Stages of a contract

Five stages of a contract.

From bid to close-out, and in a concession on into operation. Start with the stage that costs you most, because each one works on its own.

  1. 01Bid and proposal
  2. 02Contract and preconstruction
  3. 03Work at the front
  4. 04Certificates and billing
  5. 05Close-out and operation
  1. Stage 1 of 5

    Bid and proposal

    Price with what the last project really cost. Every unit price item learns from real productivity, and every bid keeps its outcome and the reason when it is lost.

    • Unit price library

      Every unit price item with the real productivity of past projects, so the price learns from what was built.

    • Bids with their outcome

      Every proposal with its status, its outcome and the reason when it is lost.

  2. Stage 2 of 5

    Contract and preconstruction

    Start the contract with the advance payment, bonds and permits in plain view. Know how much advance is left to amortize and what expires before it does.

    • Advance to amortize

      The advance payment balance of each contract goes down with every certificate and can be seen at any time.

    • Expirations

      Bonds, licenses and social security filings with a warning before they expire.

  3. Stage 3 of 5

    Work at the front

    Record what happens at the front on the same day. Every quantity, trip and machine hour is logged with photo and time, and the supplier statement is matched against what was received.

    • Daily report on the phone

      The resident engineer and the inspector record quantities, equipment, hauling and materials from the front, with photo and time.

    • Supplier statement check

      The equipment and hauling supplier’s statement is matched against delivery tickets, hour meters and arrival times.

  4. Stage 4 of 5

    Certificates and billing

    Bill everything you built, with the evidence the supervisor asks for. The pre-certificate is signed in the field, and every filed certificate carries its payment date.

    • Pre-certificate in the field

      The measurement by station with photo, time and both parties’ signatures, ready for the certificate.

    • Projected collections

      Every filed certificate with its contractual payment date, so you know when the money comes in.

  5. Stage 5 of 5

    Close-out and operation

    Close the contract and recover the retainage. Close-out items sit in one place, and the final margin is compared with the bid.

    • Close-out file

      Pending items, bonds to close and subcontracts to settle, in one place.

    • Final margin against the bid

      The real cost per installed unit against the bid unit price, project by project.

Every figure with its source

From the lender report down to the truck’s delivery ticket.

Any quantity in a report opens up to the field record that supports it.

  1. 01

    Lender report

    The project’s executed progress

  2. 02

    Progress certificate

    Approved by the supervising engineer

  3. 03

    Field pre-certificate

    Quantities measured by station

  4. 04

    Daily front report

    With the delivery ticket and the hour meter photo

The software, on a project.

  1. DataNovaCertificates, supplier statements, expirations and the cost of every project, on the systems you already have./01
  2. BrainNovaThe standby, hauling and measurement rules that live in the site log and on WhatsApp, written down with the name and role of who told them./02
  3. SectorNovaYour figures next to your peers’ in public registries and superintendencies, with a warning when they are not comparable./03

How it starts

One project task in production, with our engineers.

Pick one task, connect the systems behind it, and put it to work on your real data.

  1. 01

    Pick the task

    Usually checking the equipment and hauling suppliers’ statements against what was received at the front.

  2. 02

    Connect the systems

    Our engineers connect the ERP, the statements and the site forms, and interview resident engineers, inspectors and cost analysts.

  3. 03

    Put it to work

    The check runs on the project’s real data, and the next task is built on the same model.

Other industries

About XPTNova

XPTNova is a Colombian software company. Our engineers work inside each client until every process runs in production. Each client’s data is isolated from every other client’s, runs in our cloud or in yours, and is never used to train models.

Privacy Policy

Talk to us

Start with the stage that costs you most.

Pick one task, we connect the systems behind it, and our engineers put it in production.